FileHashIntel

a2atlassian-0.5.0/tests/integration/test_critical_path.py

1 distinct file content recorded under this name ยท 1 PyPI record

Python source file Reference

A .py file contains Python source code in plain text. The Python interpreter reads the file and runs the code directly, without a separate compile step. Developers write scripts, modules, and full programs in this format. A text editor can open and change the file. Python is one of the most used programming languages, thus .py files are common on many systems.

A file extension is only a part of the file name. It does not give a guarantee about the format or the content of a file. But on Windows, the extension selects the program that opens the file.

Hashes for this file

46b191743028e5e314d2e06ee2483783b67eb0aa5d76d322d34e73352ca1fc60 1572 bytes

  • a2atlassian 0.5.0 a2atlassian-0.5.0.tar.gz