a2atlassian-0.2.1/tests/integration/test_critical_path.py
1 distinct file content recorded under this name ยท 1 PyPI record
Python source file Reference
A .py file contains Python source code in plain text. The Python interpreter reads the file and runs the code directly, without a separate compile step. Developers write scripts, modules, and full programs in this format. A text editor can open and change the file. Python is one of the most used programming languages, thus .py files are common on many systems.
A file extension is only a part of the file name. It does not give a guarantee about the format or the content of a file. But on Windows, the extension selects the program that opens the file.
Hashes for this file
d628dbd80c03e47d2c5dd9f6988d6f3744f33772a4b9342ad6fc8f687633c296
1592 bytes
- a2atlassian
0.2.1
a2atlassian-0.2.1.tar.gz